Call Now Get a Proposal
Roberts Design Build Solutions
A Division of Roberts Environmental Control Corp. · Est. 1985

Your Last Project Took 8 Months Just to Award.
We'll Have Your Proposal Ready in 48 Hours.

Turnkey design-build under a pre-awarded BuyFair cooperative contract — no RFP, no bid protests, no finger-pointing, no budget surprises. One team, one contract, one call.

102% Faster Design-Through-Completion
$391K+ Avg. Savings on a $5M Project
90K+ Eligible Public Agencies
$0 RFP Cost to Your Agency

Sources: DBIA Data Sourcebook · NCPP RFP Tracking Project · Design-Build Institute of America

Traditional Procurement Is Costing You More Than You Think

The traditional design-bid-build process was designed for transparency. But somewhere along the way, it became an expensive, adversarial system that delays critical infrastructure and punishes the people trying to do the right thing.

$86,000
Average staff cost to award a single HVAC contract through traditional RFP

NCPP RFP Tracking Project

138+ hrs
Staff hours consumed by a complex procurement — before a single pipe is installed

NPPGov Research

6–8 months
Average timeline from planning through contract award using traditional RFP

Euna Solutions

41%
Of U.S. schools have HVAC systems that fail to meet ASHRAE ventilation standards

GAO 2020 Report

The Real Consequences

Lowest-bid contractors cut corners.

Extremely low bids indicate contractors that lack experience or financial stability — increasing risk of project failure, change orders, and subpar materials.

Finger-pointing when problems arise.

Architect blames contractor. Contractor blames engineer. Owner gets stuck in the middle with a half-finished project and a stack of change orders.

Critical infrastructure waits while paperwork piles up.

14 million school days are lost annually to asthma-related complications linked to poor indoor air quality. Your students, patients, and employees can't wait 8 months for an RFP.

Budget surprises at bid opening — and after.

Design is completed before cost is known. Change orders are the norm, not the exception. Final cost regularly exceeds the original estimate by 10–20%.

There is a better way. One that's fully compliant, competitively solicited, and lets you start your project this month — not next year.

See the Solution

Two Paths to a Project That Actually Works

Whether you've decided that you need an architect or would like to eliminate fees through a turnkey engineered solution, Roberts DBS delivers integrated design-build with single-source accountability — under a pre-awarded cooperative contract.

Path 1

Architect-Led Turnkey Design-Build

You bring the architect. We own the critical systems.

Your project has an architect. Roberts DBS steps in as the turnkey design-build partner, taking full ownership of the highest-risk mechanical, electrical, and plumbing systems — the ones where things go wrong on traditional projects.

  • Complete MEP engineering with BIM/CAD clash detection
  • Seamless architect collaboration from design through commissioning
  • Self-performed critical installations by Roberts union craftsmen
  • One point of accountability for all mechanical systems
  • Cost and design evolve together — no bid-day surprises
  • Ability to provide all or portions of HVAC design and build through the BuyFair cooperative contract
1 Your Architect
2 We Engineer MEP
3 We Build & Install
4 Commission & Deliver
Discuss Your Project

Design-Build vs. Traditional: The Numbers Don't Lie

The Design-Build Institute of America has tracked thousands of projects. The evidence is overwhelming.

Metric
Traditional DBB
Roberts Design-Build
Cost Growth
Industry average
3.8% less cost growth
Cost Per Square Foot
Baseline
6.1% lower overall cost
Construction Speed
Sequential schedule
36% faster construction
Design-Through-Completion
12–24 months typical
102% faster delivery
Procurement Time
6–8 months RFP cycle
Days with cooperative contract
Procurement Cost
$86,000+ per solicitation
$0 — already competitively bid
Change Orders
Standard / expected
Significantly fewer claims
Owner Satisfaction
Varies
75%+ rate “excellent”

Sources: DBIA Data Sourcebook, FHWA Design-Build Effectiveness Study, FMI/DBIA 2023 Mid-Cycle Survey, NCPP RFP Tracking Project

What This Means for a $5M HVAC Project

$305,000 saved in construction costs (6.1% lower)
+
$86,000 saved in procurement staff time
+
6–12 months faster project completion
=
$391,000+ saved with faster, better results

Buy More Efficiently! Start Your Project This Month.

Roberts DBS is an awarded vendor through BuyFair National Cooperative Group. Our contract has already been competitively solicited, publicly evaluated, and awarded by a lead public agency. Our BuyFair contract satisfies all Illinois bid requirements and is ready for board consideration.

Traditional RFP Process

Market Research
Develop Specifications
Publish & Advertise
Evaluate Responses
Negotiate Terms
Award Contract
Begin Work
4–8 Months · $86,000+ Staff Cost
VS

Cooperative Contract Process

Select Roberts DBS via BuyFair
Issue Purchase Order
Begin Work
Days · $0 Procurement Cost

How It Works

BuyFair is a national governmental purchasing cooperative led by Region 15 Education Service Center (a Texas state agency). Every BuyFair contract goes through a rigorous 6-step competitive process:

  1. Solicitation — Competitive solicitation issued by lead public agency
  2. National Advertisement — Published nationally for maximum vendor participation
  3. Piggybacking Language — Intergovernmental language makes it accessible to agencies in all 50 states
  4. Sealed Responses — Recorded and opened publicly for full transparency
  5. Evaluation — Judged on quality, performance, and price
  6. Award — Lead agency issues award — available to all member agencies

100% audit-proof. All due diligence documentation is available for every awarded vendor. Your procurement team can verify the entire competitive solicitation process. Membership is free — no fees, no obligations, no minimums.

Why Agencies Choose Cooperative Contracting

80% Time Savings

What takes 6–8 months via traditional RFP can be accomplished in days. Your procurement team issues a PO instead of running a solicitation.

Significant Cost Reduction

Aggregated purchasing power drives competitive pricing. Plus you eliminate the $86,000+ administrative cost of running your own solicitation.

Full Compliance

Every BuyFair contract is competitively solicited per procurement law. Complete documentation available for audit. Authorized in all 50 states.

Pre-Vetted Quality

Vendors are thoroughly evaluated on quality, performance, and capability — not just lowest price. You get contractors who can actually deliver.

Reduced Risk

Contracts have undergone rigorous legal review. No bid protests. No procurement stoppages. Pre-negotiated terms protect your agency.

Emergency Ready

When critical systems fail, cooperative contracts let you engage a qualified contractor immediately — no emergency procurement waiver needed.

Who Can Use Cooperative Contracts?

BuyFair contracts are available to over 90,000 public agencies nationwide:

K–12 School Districts
Colleges & Universities
Hospitals & Healthcare
City & County Government
State & Federal Agencies
Non-Profit Organizations
Tribal Entities
Houses of Worship

Are You Interested in a Better, Faster, More Cost Effective Approach to Your Next Project?

Membership is free. No obligations. No minimums. Start with a conversation.

From First Call through Commissioning

A clear, predictable process that eliminates the adversarial relationships of traditional delivery.

1

Discovery & Needs Assessment

We sit down with your team to understand facility needs, budget parameters, timeline, and operational constraints. We evaluate whether Path 1 (Architect-Led) or Path 2 (Fast-Track Turnkey) is the right fit. Timeline: 1–2 weeks.

2

Conceptual Design & Budget Lock

Our engineers develop preliminary designs with real-world cost estimates. You see the budget before a single construction document is drawn. Cost and design evolve together — no downstream surprises. Scope, budget, and schedule are verified with you before a proposal is issued. Timeline: 2–4 weeks.

3

Procurement and Engineering

A fixed-price, no-change-order proposal is priced per our BuyFair contract and submitted for review and action. Upon approval, full MEP engineering with BIM coordination and clash detection begins. Design, permitting, and early equipment procurement happen in parallel — that's the fast-track advantage that saves months. Timeline: 4–8 weeks.

4

Construction & Self-Performance

Craftsmen from Roberts Design Build Solutions self-perform HVAC installations. All other necessary trades are procured and managed by a Roberts dedicated project manager. Weekly owner updates and proactive issue resolution keep the project on track. Timeline: project-dependent.

5

Commissioning & Handover

Unlike traditional projects, Roberts will be by your side through the commissioning of your system through both seasonal changeovers. We provide rigorous testing, air balancing, and commissioning to ensure every system performs to spec. Complete documentation, staff training, and warranty coverage. Project delivered — on time, on budget, fully operational. Timeline: 1–2 weeks.

Complete Construction Management & Turnkey Design-Build

Trusted by school districts, municipalities, park districts, and public agencies across Illinois — Roberts DBS serves as your single-source construction manager, coordinating every trade, every phase, and every detail from concept through commissioning.

What We Self-Perform

Self-Performed

HVAC Systems

Complete heating, cooling, and ventilation. Rooftop units to central plants, installed by our own union craftsmen.

Self-Performed

Piping & Process Systems

Hydronic, steam, process piping, and specialty systems with certified welders.

Self-Performed

Sheet Metal & Fabrication

In-house fabrication shop producing custom ductwork and assemblies — no subcontractor markup.

Self-Performed

Controls & Building Automation

DDC controls, BACnet integration, SCADA systems, and building automation.

Full Project Delivery

Construction Management

Single-source project oversight from pre-construction through closeout. Budget, schedule, quality, owner representation at any scale.

MEP Engineering & Design

Full mechanical, electrical, and plumbing engineering with BIM/Revit clash detection. Cost and design evolve together.

All-Trade Coordination

Electrical, plumbing, fire protection, structural, roofing, interiors, and sitework — all managed under one contract.

Pre-Construction & Value Engineering

Real-cost budgets before committing to design. Our VE process has saved clients millions without sacrificing quality.

Project Types

Schools, hospitals, municipalities, government, commercial, industrial, and houses of worship.

24/7 Emergency Response

When critical systems fail, cooperative contracts let you engage immediately — no emergency procurement waiver needed.

One contract. Every trade. Any project. Under our BuyFair cooperative agreement, Roberts DBS provides construction management for the complete scope of work — not just the mechanical systems we self-perform. We coordinate architects, engineers, and every specialty trade to deliver your project on time and on budget.

Addressing Your Concerns Head-On

We know cooperative contracting and design-build are different from what you're used to. Here are the questions we hear most.

“Does this bypass competitive bidding requirements?”

No. Every BuyFair contract goes through a full competitive solicitation conducted by Region 15 Education Service Center (a Texas state agency serving as lead public agency). Bids are sealed, publicly opened, and evaluated on quality, performance, and price. The competition already happened — at a larger scale than any single agency could conduct. Complete solicitation documentation is available for your audit file.

“Is this compliant in our state?”

Yes. All 50 states have joint powers or cooperative procurement statutes that authorize piggybacking on competitively solicited contracts from other government agencies. BuyFair's solicitations include intergovernmental language specifically enabling this. We can provide state-specific legal documentation for your counsel.

“Will we get competitive pricing?”

For complex HVAC and mechanical services, the value goes far beyond unit pricing. You eliminate $86,000+ in procurement costs, 138+ hours of staff time, and 6–8 months of delays. BuyFair evaluates on total cost of ownership — quality, performance, and price — not just lowest bid. Plus, every dollar is tracked with open-book transparency.

“What if our project is complex or unique?”

The cooperative contract provides the compliant procurement framework. The actual scope, design, and engineering are 100% customized to your facility. We've installed 2,700 HP high-pressure steam boilers at VA medical centers and engineered $1.2M in value-engineered savings on full-block housing developments. No project is too complex.

“We've always done RFPs. Why change?”

Because your infrastructure can't wait. 41% of U.S. schools fail ASHRAE ventilation standards. 14 million school days are lost to asthma annually. The traditional process was designed for transparency, and cooperative contracting delivers that same transparency — with 80% time savings and zero procurement cost. It's not a shortcut. It's a better path to the same destination.

“How is design-build different from what we've done before?”

Traditional design-bid-build separates design from construction, creating competing interests and finger-pointing when problems arise. Design-build integrates both under one team and one contract. Cost and design evolve together. Problems are solved collaboratively, not litigated. DBIA data shows design-build delivers 6.1% lower costs and 102% faster completion.

Built on Precision. Delivered with Accountability.

Roberts Design Build Solutions is a division of Roberts Environmental Control Corp., a premier mechanical contractor serving commercial and industrial facilities across Illinois and the Midwest since 1985.

The DBS division was created to meet growing demand for integrated project delivery. Our clients were tired of fragmented responsibility, lowest-bid contractors cutting corners, and projects that came in late and over budget. They wanted one team that would own the outcome.

Backed by Roberts' deep bench of engineers, project managers, BIM specialists, and union craftsmen — and empowered by BuyFair cooperative contracting — DBS delivers projects that traditional methods cannot match: faster, more predictable, and fully accountable.

Self-Performance

Our own union craftsmen install the critical systems. No subcontractor roulette on the work that matters most.

Open-Book Transparency

Every dollar tracked and auditable. No hidden markups. No change-order games. Full cost visibility from day one.

Single-Source Accountability

One contract. One team. One phone call when you need answers. Design-build eliminates the blame game.

Cooperative Compliance

Audit-proof procurement through BuyFair. Complete documentation for your records. Fully compliant in all 50 states.

Get a Proposal in 48 Hours — No RFP Required

Whether you're exploring design-build for the first time, need an emergency HVAC replacement, or want to understand how cooperative contracting works for your agency — we'd love to hear from you.

Proposal in 48 hours Not 8 months
Free facility assessment No obligation
State-specific compliance docs For your legal team
Phone 708-429-7700
Office 8500 W 185th St, Suite B
Tinley Park, IL 60487

We respond within one business day. Usually faster.